Landscape Irrigation Network
Landscape irrigation in two steps: water demand of every zone (solenoid valve) from project rates, ShNQ 2.04.01-22 or ETo, run times and a valve program inside the irrigation window; then the main line point by point with the shared network engine - pump flow and head, pressure at every valve, storage tank and take-off.
1 ยท Water demand and irrigation window
2 ยท Zones (one solenoid valve each)
| # | Zone / valve | Plant | Device | Quantity | Rate (L/unit/day) | KL | Canopy Ø (m) | Devices per plant | Device flow (L/h) | Emitter spacing (m) | Row spacing (m) | Precipitation (mm/h) | Pressure at valve (bar) | Stub-out at point | Stub L (m) | Stub Ø |
|---|
3 ยท Main line pipe
4 ยท Points in order from the supply tee
| # | Point | Distance from previous (m) | Ground level (m) | Elbow 90° | Elbow 45° | Elbow 22.5° | Valve | Main Ø (if different) | Quick coupler | |
|---|---|---|---|---|---|---|---|---|---|---|
| โฉ | Back to start | |||||||||
Schematic
5 ยท Pump / supply and quick couplers
โ๏ธ Device pressures, losses and limits
Landscape Irrigation Network
1 - Water demand
โข Every zone = one solenoid valve, one plant type, one device (do not mix devices on a valve).
โข Methods: project rates (L/plant/day, L/m²/day), ShNQ 2.04.01-22 Annex 3 item 26 (lawn 3, green areas and flower beds 3 - 6, sports 1.5 L/m² per watering × waterings per day) or ETo × KL / efficiency.
โข Flow: bubblers / emitters per plant, dripline grid, spray or rotor precipitation rate. Run time = daily water / flow.
2 - Valve program
โข Valves running together form a group; the groups run one after the other inside the window. Automatic grouping keeps the largest group flow (the pump flow) as small as possible.
3 - Main line
โข Points from the pump / supply tee (loop or single line); every valve on a stub-out; quick couplers on points.
โข Every group and the quick couplers are solved; the worst gives the pump head. Valve inlet pressure = device pressure × (1 + lateral allowance) + valve loss (+ filter loss for drip).
โข Pump flow and head, tank, monthly water, velocities, take-off.
Key Points:
- Project rates, ShNQ 2.04.01-22 Annex 3 or ETo / KL
- Bubblers, emitters, dripline, spray, rotor
- Run times and automatic valve program in the window
- Pump flow and head, tank volume, monthly water
- Main line loop or single line - shared network engine
- Pressure at every valve, quick coupler scenario
- Take-off: pipes, tees, valves, solenoid valves, quick couplers
- PDF and CSV report
Calculation Steps:
- Enter all required parameters
- Click "Update Calculation"
- Review results and analysis