Precast Manhole Take-off (Procurement)
Enter each manhole's cover level, invert level and pipe sizes: the calculator picks the manhole type from the outgoing pipe and counts base elements, 0.90 / 0.60 / 0.30 m rings, top slabs, cast-iron covers, steps and necks, plus excavation, compaction, blinding, sand bedding and backfill - one procurement list for the whole network.
1 ยท Manholes
| # | Manhole | Cover level (m) | Invert level (m) | Outlet Ø (mm) | Inlets | Inlet Ø (mm) | Type |
|---|
2 ยท Pipe runs (for trench excavation, sand and backfill - optional)
| # | From manhole | To manhole | Pipe Ø (mm) | Length (m) | Trench width (m, optional) |
|---|
โ๏ธ Project settings (site values by default)
Precast Manhole Take-off
Procurement and BOQ quantities for storm water and sanitary sewer networks built with precast circular manholes.
Manhole type (outgoing pipe governs):
โข Up to Ø600 โ circular Ø1200 (base 0.90 + 0.30 m)
โข Ø700โ800 โ circular Ø1500 (base 1.20 + 0.30 m)
โข Ø900โ1000 โ rectangular 3000 × 3500 mm
โข Ø1100โ1500 โ rectangular 3500 × 4000 mm
โข Ø1600โ2500 โ rectangular 5000 × 5000 mm
Rings: 0.90 / 0.60 / 0.30 m, fewest rings; the rest up to the cover level stays as the gap above the slab (โฅ 0.05 m, a neck from 0.20 m).
Steps: from 0.10 m above the outlet crown, every 0.30 m, up to 0.30 m below the cover.
Key Points:
- Any number of manholes and pipe runs
- Manhole size from the outgoing pipe Ø
- Base types by size, outlet Ø and inlets
- Ring stack, slab, cover, neck and steps per manhole
- Earthworks: excavation, compaction, blinding, bed, sand, backfill
- Procurement list, PDF and CSV export
Calculation Steps:
- Enter all required parameters
- Click "Update Calculation"
- Review results and analysis