Site Water Supply Network
Water supply network of a site or district, point by point to every building: daily and peak demand from the norms, required pressure per building, mains / tank + booster / zoned supply, residual pressure, static pressure check, combined domestic + fire scenario and take-off with tees, valves and water meters.
1 · Standard and demand factors
2 · Buildings
| # | Building | Type | Persons / units | Norm (L/unit/day) | Floors | Floor height (m) | Supply | Floors from mains (zoned) | Connected at point | Service L (m) | Service Ø | Elbows | Valves | Meter | Inlet level (m) | Peak flow (L/s, optional) |
|---|
3 · Pipe and line
4 · Points in order from the supply tee
| # | Point | Distance from previous (m) | Ground level (m) | Elbow 90° | Elbow 45° | Elbow 22.5° | Valve | Main Ø (if different) | Hydrant | Branch L (m) | Branch Ø | Branch valve | Outlet height (m) | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ↩ | Back to start | |||||||||||||
Schematic
5 · Supply
⚙️ Pressures, local loss coefficients and limits
Site Water Supply Network
Demand
• Buildings: type, persons / units × daily norm. Residential norms from ShNQ 2.04.02-19 Table 1; other building types from ShNQ 2.04.01-22 Annex 3 (average day); mosque and other: typical values.
• Maximum day = average × Kday (1.1 - 1.3); maximum hour = Khour × maximum day / 24, Khour = αmax (1.2 - 1.4) × βmax (Table 3, total persons).
Pressure at the building
• ShNQ / SP: 10 m + 4 m per floor above the first (2.32), at most 60 m static (2.34).
• Supply: automatic, mains pressure, tank + booster or zoned. Automatic: the mains fill the tank, and the report shows how many floors the mains pressure can serve.
Network
• Points from the supply tee (loop or single line); every building is connected to a point by its service line with tee, elbows, valves and water meter.
• Combined domestic + fire network: maximum hour + fire flow at N adjacent hydrants (2.22).
• Required supply pressure, or check of an available pressure; take-off.
Key Points:
- ShNQ 2.04.02-19 demand and pressure rules (also SP, EN, TR, IPC)
- Building by building: daily, maximum day, maximum hour
- Mains / tank + booster / zoned supply, floors served by the mains
- Static pressure check - pressure reducing valve
- Combined domestic + fire scenario
- Loop or single line, point by point - shared network engine
- Take-off: pipes, tees, valves, water meters, elbows
- PDF and CSV report
Calculation Steps:
- Enter all required parameters
- Click "Update Calculation"
- Review results and analysis